Community‎ > ‎

Facility Projects

Over the last year, the topic of growing enrollment and planning for future facility needs has been discussed at regular board meetings and facility committee meetings. Recently, the conversation has deepened about these topics as the result of a facility study conducted last year and the annual bleacher inspection. The results of the facility study indicated there are many options to accommodate more students within our existing footprint by adopting some minor changes, but there are also spaces or structures that were deemed insufficient. WCHS administration is proposing a music addition, configuring vacated space into classrooms, and bleacher replacement. These projects were chosen based on the results of the facility study, student participation in certain programs, and the annual bleacher inspection. The proposed projects will not require a voter approved referendum. The addition to the school and configuring the space vacated by the music department, will create the necessary capacity to accommodate growing enrollment numbers. 

Contact us
Have questions about the projects that aren't answered in the Frequently Asked Questions document? Use the contact us link above to submit your question.
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
Ċ
View Download
  141k v. 6 Jul 31, 2018, 7:03 AM Anne Bradford